Grange Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Grange Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Grange Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, DN15 8RY    
Type of installation: Wind    on/offshore: on
Turbines :6  Capacity : 12.3 MW
Approx Date of 1st power generation: December 2015

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The Grange Wind Farm was developed as a joint venture project between Wind Prospect and RidgeWind. The site will be comprised of 6 turbines each rated at 2.05MW. The whole wind farm will have a rated capacity of 12.3MW. Each turbine is likely to have 45 metre blades and a maximum tip height of 126 metres.

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

Grange Wind Farm Flixborough Stather Road Scunthorpe DN15 8RY England

 Associated Companies.

Relationship Company (For: Grange )
DeveloperBlue Energy Co
OwnerBlue Energy Co

 DECC Data on this Project: Grange :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Grange     12.3 MW
Energy Type: Wind Onshore
County: Humberside     Country: England     LPA: North Lincolnshire Council
Site ID and Reference: 4069 / AA171     District:
Applicant: Octopus Investements/Blue Energy     Application : WF/2010/1242 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 6 Turbine Capacity: 2.0499999999999998
Height of Turbines: Calculated capacity: 12.3
Site Address: Grange Farmhouse, Land adjacent to, Flixborough
 
County: Humberside Region: Yorkshire and Humber
OS Coordinates: 486042 / 486042
Development Status: Operational
Application Submitted: 11/2/2010 Planning Permission Granted
Application Determined: Permission refused: 4/6/2011
Construction Date: 1/1/2015    
Generator Live 12/15/2015 This Record Last Updated: 7/31/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 4/6/2011

Site Name: Flixborough Grange Farmhouse     14 MW
Energy Type: Wind Onshore
County: Humberside     Country: England     LPA: North Lincolnshire Council
Site ID and Reference: 2690 / A0125     District:
Applicant: Grange Wind Farm Ltd     Application : WF/2009/0573 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 7 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 14
Site Address: Flixborough, Scunthorpe,
 
County: Humberside Region: Yorkshire and Humber
OS Coordinates: 487532 / 487532
Development Status: Revised
Application Submitted: 5/11/2009 Planning Permission Granted
Application Determined: Permission refused: 1/29/2010
Construction Date:    
Generator Live This Record Last Updated: 1/25/2010
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 1/29/2010

 OFGEM Data on this Project: Grange: Wind :

Site Name: Grange Wind Farm 2
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00386RQEN
Capacity: 12150 Status: Live
Accreditation Date: 5/11/2009    
Commission Date: 1/18/2016    
Applicant: Grange Wind Farm Limited
Applicant Address: 10 West Street Alderley Edge SK9 7EG England
Address: Grange Wind Farm Flixborough Stather Road Scunthorpe DN15 8RY England

Site Name: Grange Wind Farm 2
Generator Type: Wind
Scheme : REGO Generator ID: G02862NWEN
Capacity: 12150 Status: Live
Accreditation Date: 5/11/2009    
Commission Date: 1/18/2016    
Applicant: Grange Wind Farm Limited
Applicant Address: 10 West Street Alderley Edge SK9 7EG England
Address: Grange Wind Farm Flixborough Stather Road Scunthorpe DN15 8RY England
 
Assumptions: Capacity: 12150kW 12.15 MW,
Thus over the month Capacity * 720 hours per month = 8748 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 2842 23.39% Issued
01/03/2018 3198 26.32% Issued
01/02/2018 2602 21.42% Issued
01/01/2018 4133 34.02% Issued
01/12/2017 3374 27.77% Issued
01/11/2017 3093 25.46% Issued
01/10/2017 4081 33.59% Issued
01/09/2017 2325 19.14% Issued
01/08/2017 2117 17.42% Issued
01/07/2017 2045 16.83% Issued
01/06/2017 2817 23.19% Issued
01/05/2017 2411 19.84% Issued
01/04/2017 2383 19.61% Issued
01/03/2017 3156 25.98% Redeemed
01/02/2017 3331 27.42% Redeemed
01/01/2017 2506 20.63% Redeemed
Dec-16 02651 2945 24.24% Issued
Nov-16 01959 2177 17.92% Issued
Oct-16 01613 1793 14.76% Issued
Sep-16 02274 2527 20.80% Issued
Aug-16 02221 2468 20.31% Issued
Jul-16 01721 1912 15.74% Issued
Jul-16 01721 1912 15.74% Pending Tr
Jun-16 01068 1187 9.77% Issued
Jun-16 01144 85 0.70% Issued
May-16 02410 2678 22.04% Issued
Apr-16 02120 2355 19.38% Issued
Mar-16 02010 2233 18.38% Redeemed
Feb-16 02785 3095 25.47% Redeemed
Jan-16 02022 2247 18.49% Redeemed

 Calculations


Capacity: 45.1
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 5/16/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 45.1 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 353382

Project Info
Go ahead for £800m of new power projects in Fife and GRANGEmouth
PPP added that development funding was also being made available to continue planning for the “nationally significant” 270MW North Kyle wind power scheme.

Renewable energy projects win clean power auction
The Moray East Offshore wind farm is planned for the Moray Firth and a biomass heat and power plant will be built in GRANGEmouth.

Senvion wins four UK orders with Blue Energy totalling over 45 MW
GRANGE Wind Farm will consist of six MM92, Kelmarsh Wind Farm is located in Northamptonshire and will consist of a further six MM92, Winwick Wind Farm will also consist of six MM92 turbines, Chiplow Wind Farm

SPI sells GRANGE Farm solar project to Blackrock investment fund
Solar developer SPI has sold its entire stake in the GRANGE Farm solar project to an investment fund managed by the infrastructure group at investment managers Blackrock.

SPI sells GRANGE Farm solar project to Blackrock investment fund
Solar developer SPI has sold its entire stake in the GRANGE Farm solar project to an investment fund managed by the infrastructure group at investment managers Blackrock

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School